Feeds:
Posts
Comments

Archive for the ‘2010 LA Bike Plan’ Category

Timeline_Year2

Timeline for Bike Plan’s Second Year Projects. Click image for full .pdf document.

It was four years ago when Los Angeles adopted its Bicycle Plan, an ambitious vision of over 1,600 miles of bikeways crisscrossing the City in a safe and connected network.

Fact_Sheet_Year2_Page1

Click image for full “Second Year Implementation Fact Sheet” .pdf

With the forth year of implementation underway, the Bike Program in collaboration with the Department of City Planning is conducting outreach on a number of major bike lane projects currently on the horizon.

In the coming weeks, the City will be hosting roundtable forums to  address concerns and articulate the goals of the projects on a local level. The forums are intended to engage a broad cross-section of the affected constituents, hearing from multiple perspectives, including: local organizations, businesses, residents, bicycle commuters, neighborhood councils, council district offices, and other key stakeholders.

Upon sharing the big picture goals, and listening to diverse community concerns, the City will follow up with an analysis of the potential options. The analysis will include relevant data that highlights the benefits and impacts of each option, which will be informed by the roundtable discussions. Ultimately, the details of each project will reflect a collaborative vision incorporating local needs and citywide policy goals. The design options will be presented at larger public hearings, where a formal staff report will be made available in advance for additional input before final approval.

The projects up for discussion, formally part of the “Second Year” of the Bicycle Plan’s implementation, are:

For context and background on the process, find below the presentation that was given during a webinar on April 17th. The audio recording from the webinar is available as well for your review.

Presentation

Second_Year_Implementation

Click image for a .pdf of the presentation shared during the webinar.

Webinar

For additional information or questions regarding the process or specific projects, please contact David Somers of the Department of City Planning:

David Somers
Tel: (213) 978-3307
Fax: (213) 978-1477

david.somers@lacity.org

Read Full Post »

Sharrows on Westholme Dr. in Los Angeles

A pair of sharrows on Westholme Dr. in Los Angeles

We’re excited to announce that LADOT crews will be installing approximately 20 miles of new shared-lane markings — or “sharrows” — in neighborhoods across the city.  Sharrows are intended to supplement the bicycle lane network in Los Angeles by:

  • Providing gap closures in the Class II (Bike Lane) network
  • Enhancing Class III (Bike Route) Bikeways- This includes future BFS facilities
  • Improving bicycling conditions on two-lane roadways with dashed centerlines


Click here to access or download the original spreadsheet

(more…)

Read Full Post »

Virgil Village bike lane dedication

Councilmember Mitch O’Farrell speaks about the economic and safety benefits of the new Virgil Avenue bicycle lanes.

New bicycle lanes have been installed on Virgil Avenue in East Hollywood. The bicycle lanes stretch from Santa Monica Blvd. to Melrose Ave. and were installed in conjunction with new pavement and crosswalk striping at intersections. Over this past weekend, Council Member Mitch O’ Farrell hosted a small ceremony in Virgil Village to celebrate the neighborhood’s latest bicycle lane project. Before leading a group of residents to test ride the new lanes, the council member gave a small speech acknowledging the economic and safety benefits of the new lanes, as quoted by L.A. Streetsblog yesterday: “…we implemented a solution that makes for a better pedestrian environment and that encourages small business growth along this blossoming commercial corridor”.  For more photos of the event, check out our Flickr page. (more…)

Read Full Post »

LADOT is pleased to release the cumulative list of Year 2 planned bicycle lanes. See the list below for the street name, council district and the respective mileage and limits of each project.


Click here to access or download the original spreadsheet (Revised 1/23/14 to include spreadsheet link)

This Year 2 list contains the next 40 miles of bicycle lanes prioritized for installation.  Each project is part of an ongoing effort to strategically close gaps in our bikeway network by connecting new infrastructure to existing bicycle paths, lanes and routes in Los Angeles.  A number of these projects are funded through the Highway Safety Improvement Program (HSIP).

Moving forward, LADOT will begin traffic and safety assessments for the Year 2 projects. Results from this analysis will be made available in a public report.  Upon completion of Traffic and Safety Assessments, LADOT and the Department of City Planning will hold a series of public hearings to disclose the analysis and give interested groups an opportunity to express their support or concern over the proposed bicycle lanes.

Read Full Post »

The Bicycle Program has been working on an update to our Bikeways Map on BicycleLA.org. In addition to our regular updates that keep the Bikeways Map accurate as new bikeways are installed, we’ve recently added new features to make the map more user-friendly and informative than ever.

legend1

We’re using new colors to show the different bikeway types.

New Legend and Map Colors: Traditionally, the map has displayed all bikeways in Los Angeles, using different colors to distinguish between paths, lanes, routes, and sharrowed routes. Now, we’ve adjusted the old color scheme to make it easier for readers to distinguish between the different types of bikeways. Bicycle paths are shown in green, bicycle lanes in red, bicycle routes appear blue, sharrowed bicycle routes are a pink-magenta, and bicycle friendly streets are a light blue.

(more…)

Read Full Post »

2nd st pre marking under the 110 freeway

2nd St. bike lanes are on their way!

Downtown Los Angeles is getting better and better for bicycling. In addition to the recently implemented 7th St. bike lanes, we’re happy to announce that new lanes are being installed on 2nd St., this weekend. Work crews have already begun the process of removing the existing striping from the street. The next step will include installing new thermoplastic striping atop the mark out paint seen in the photos above and below. The new bicycle lanes will feature buffers (from Broadway to Figueroa) and will be installed from North Spring Street through the 2nd St. tunnel (which we know many are very excited about!) through to Glendale Blvd.  (more…)

Read Full Post »

This West Valley segment of the LA River Bicycle Path was completed this year.

Today, we have a special guest post from LADOT General Manager Jaime de la Vega:

We noted our major bike accomplishments in our FY 2013 annual report (data through April 28, 2013) but I wanted to take the opportunity to give our stakeholders the final tally.

FY 2013

  • LADOT installed the first bicycle friendly street treatment on Yucca Street
  • We completed 1.5 miles of new bicycle path
  • We installed shared lane markings (sharrows) on 22.6 miles of city streets
  • And we installed 101 miles of new bicycle lanes, doubling the prior year’s tally, which was our best year ever until FY 2013

Other Metrics

  • Post-Bicycle Plan (March 2011 – Current): We installed 167 miles of new bike lanes (the city’s adopted five-year plan is at least 200 miles of new bikeways)
  • FY 2006 through FY 2013: LADOT installed 197 miles of new bike lanes and 16.6 miles of new bike paths
  • FY 1974 through FY 2005: The city installed 141 miles of bike lanes
  • The city’s current bike lane network is 338 miles

* Data note: Some of the current figures vary slightly from past reporting and reflect database clean-up.

Read Full Post »

Older Posts »

Follow

Get every new post delivered to your Inbox.

Join 3,103 other followers

%d bloggers like this: